BART Berryessa Extension
Envirosurvey provided the following services for the BART Berryessa Extension:
A comprehensive Phase II environmental site assessment and soil characterization.
Collected and analyzed 800+ soil samples. Compiled and executed reports containing soil analysis, boring locations, observations and recommendations.
Developed site specific health and safety plans for work areas containing hazardous contamination throughout the site and updated the plans to accelerate work as new data was developed.
Conducted the Self Monitoring Program, required by the Regional Water Board for operation of multiple dewatering and groundwater treatment systems.
*The images above were taken by ESI at the BART Berryessa Extension project