Bay Bridge East Span Demo & Temporary Bypass
ESI prepared various environmental submittals and conducted soil characterization for disposal and effluent treatment, sampling, and monitoring, as required by Cal Trans contract specifications. Additionally, ESI conducted pre-demolition survey for the presence of Asbestos Containing Materials (ACM) on the Cantilever Truss and Temporary Bypass Sections of the old East Span of the San Francisco-Oakland Bay Bridge



*The images above were taken by ESI during the By Bridge East Span demolition project