Devils Slide Tunnel
ESI worked on the construction of the Devils Slide Tunnel and provided the following services:
Furnishing and installation of a 600 gpm Temporary Non-storm Water Treatment System (TNSWTS) for the treatment and discharge of groundwater encountered during the tunnel construction.
Furnishing and installation of a 600 gpm Work Access Area Treatment System (WAATS) for the treatment and discharge of storm water runoffs from the construction areas and muck disposal site area.
Mandatory compliance with all regulatory agencies to achieve the discharge requirements for treated water from this project into the designated outfall location to the Pacific Ocean.
Treatment and discharge of storm water run-off from Devils Slide Tunnel Reconstruction project was performed under the permits issued by the Regional Water Board and US EPA.
*The images above were taken by ESI at the Devils Slide Tunnel project